Adopt a program level ToC - Clean and finalise this - expose to teams and scientists, getting feedback. Irmgard, PeterT, chief scientists. By end July.
Elaborate ToC for 'project' activities/protocols in regions. Start in Ethiopia with project ToC to groundtruth the approach. PeterT. Feedback/learning in early september.
Early Sept - organize a cross-region discussion - Bernard to lead
Find the wider FtF/USAID 'zone of influence' numbers and include as targets in phase 2 (from scaling and partners not from direct research). Add thru the IPs. Carlo/IFPRI with heavy inputs from country teams. Ready in time for the external review - mid Oct latest
Included into work stream of the program workshop
? action/discussion points
Ethiopia test - PT to follow up urgently.
Wageningen meeting include update on this
.
2
'Systems' research futures
Washington perception that cg systems crps 'failed' - implications for AR? Bernard assured us that the recent situation is more positive.
Mission buy-in is a way to counter this
Different forms of 'systems' research - livelihoods systems versus cropping/farming systems. Worry that systems research in new commodity agri-food crps will be less livelihoods type.
These issues and concerns need to be addressed in the phase 2 proposal
Develop and document a strong evidence based storyline; breadth, focus .. unique selling point.
Ready in time for the external review - mid Oct latest
Included into work stream of the program workshop
To be discussed in the pct design retreat in Wageningen
Use the strategy workshop to take forward.
3
Phase 2 proposal
Proposal to be submitted - April/May 2016 estimate
Develop and document a strong evidence base for the scaling approach; partnerships; numbers; impact pathways
Have something around the 5+2 SI indicators ready
Perhaps need to have 3 projects - linked - to avoid usaid financial ceilings
Constitute small design group - petert, irmgard, chief scientists, carlo, bernard
- impact pathways piece
- systems piece
- numbers piece
[dates: 1-4 september in Wageningen)
Consider ways other initiatives can co-support AR; or we co-support them (eg BMGF-ICRISAT sep 2015 drylands WA convening - Bernard following up)
Need to consider 2 other issues in the phase 2 proposal: partnerships; climate-smart ag
Included into work stream of the program workshop
To be discussed in the pct design retreat in Wageningen
Use the strategy workshop to take forward.
Drylands convening - Bernard follow up
3
Engaging farmers into program activities
- we have engagement guidelines / circulate and perhaps revise/ common principles needed
- take stock how this happens in different countries - chief scientists Included into work stream of the program workshop
Irmgard is following up with chief scientists and Platform coordinators (PT to follow up in Ethiopia).
2 postdocs getting involved - thru MSU and Columbia U; first results in July 2016. partners meetings, validation, visits all planned, also with AR sites. July 2015 start. Vara to send concept notes to Jerry to circulate.
Post-San Jose steering committee led by SI lab (Vara) the main vehicle to take this agenda forward. Also need more comms around the agenda and all the various activities to wider groups (eg the san jose group). Evolving into a SI CoP.
Included into work stream of the program workshop
? action/discussion points Carlo, IHZ and PT to continue active involvement in the steering committee.
Starts September 2015; Ethiopia, Ghana, program workshop, then Mali
ESA in March 2016
Final report April 2016
Interim report Nov 2015
Make clear it is 3+1 projects
CA - Hold a meeting to take this forward. Carlo to lead the typologies followup. Need to link with HT discussions, embed into experimentation, engaging with farmers.
Wageningen meeting planned - 31 Aug and 1 Sep
Included into work stream of the program workshop
? action/discussion points Work on Farm typologies - Carlo to lead follow up
Agreed that the symposium needs to be more of a strategic workshop.
To be held 6-8 October in Mali
co-locate with learning/M&E events
? action/discussion points
See points below
Preparing the October workshop
Work stream
Discussion points/actions
people responsible (process shepherd pre-meeting)
Preparation phase
Logistics
Irmgard leading organizing committee
Organizing committee
Invitations sent
Local host Agenda
Evidence-based narratives, stories, briefs, products for different audiences
PB to follow up with Carlo
Carlo; PeterB
Agree template (2-pager);
Produce model (with content);
Solicit stories and ideas for technologies to be discussed at meeting (min 3 per country)
Reflections and guidance on typologies and IPs
PT to help Irmgard on that one.
Irmgard; Jeroen, Carlo, Bernard, PCT
Tables of typologies by country;
Info on ways we engage with farmers by country;
IP status by country
Targets and scaling approaches
Carlo; Bernard (for diagram write-up)
Draft template across the 5 SI dimensions;
Proof of concept of possible scaling targets
SI indicators and assessment framework
Sieg, PeterT
Draft assessment framework;
SI lab concept note
Phase II proposal
Bernard
Vision of success;
ToC;
Hypotheses;
System perspective write-up
(generated in the september design group meeting)
Phase 1 action list
We did not review this - needs to fold into lists above
Action
Discussion points/actions
Format
Team
Explain and document and capitalize on our system-level perspectives. Define AR identity and unique selling points - roles, beneficiaries, value added …
info in the proposal
Irmgard, Peter T, Peter B., Kindu, Asamoah, Mateete, Bernard, Jerry, Carlo
Document and contextualize impact/adoption through data. Explain/document R&D impact and institutional impact. Carry out socioeconomic analysis ad risks.
reports,flyers, materials with evidence, case studies per country, some for symposium? Selling our key USPs - systems, the 5 SI domains
Carlo+4, Bekele, Asamoah, Mateete, Peter T., Jonathan, Simret, Peter B.,
Identify and document technology packages and protocols (link to farmer typologies)
database of technologies; some other types of derivative products (factsheets)
ALL through the PMMT, Peter T., Jeroen, Carlo, bernard
Develop and use system-wide SI indicators; AR own small group to speed this up.
Discuss at October workshop
Irmgard, Peter T., Bernard, Jerry, Carlo
Data management: farm/farmer data; queryable database of AR farmers
LATER
PT/CA to discuss soon
IFPRI team, ILRI, in collaboration with the research teams
Projects to clarify R4D/IPs roles, objectives and approach - especially to IP members and participants. ESA and WA to document their platforms and guidelines and practices
useful for the external review team / include in symposium maybe
Mateete, Asamoah, Peter T.
Recruit AR manager/administrator for program level work packages
LATER
July/aug pct meeting discuss further.
Irmgard, Peter T., Peter B., Carlo
Recruit M&E data staffing/people into each regional project
LATR
include in phase 2 based on phase 1 experiences. TOR by Carlo; recruitment joint effort
Irmgard, Peter T., Peter B., Carlo
Strengthen relations with AID missions
LATER
do streams B and C for missions. Use Tracey in Ethiopia
Africa RISING program coordination team meeting #9
Date : 7 July 2015
Venue: Online
Time: 15:00 - 16:00 (EAT)
PCT page
Quick PCT meeting post Washington DC
Next PCT meeting, 4 August
Main discussion/action areas for updates:
Overall action points
Elaborate ToC for 'project' activities/protocols in regions. Start in Ethiopia with project ToC to groundtruth the approach. PeterT. Feedback/learning in early september.
Early Sept - organize a cross-region discussion - Bernard to lead
Find the wider FtF/USAID 'zone of influence' numbers and include as targets in phase 2 (from scaling and partners not from direct research). Add thru the IPs. Carlo/IFPRI with heavy inputs from country teams. Ready in time for the external review - mid Oct latest
Included into work stream of the program workshop
Ethiopia test - PT to follow up urgently.
Wageningen meeting include update on this
.
Mission buy-in is a way to counter this
Different forms of 'systems' research - livelihoods systems versus cropping/farming systems. Worry that systems research in new commodity agri-food crps will be less livelihoods type.
These issues and concerns need to be addressed in the phase 2 proposal
Develop and document a strong evidence based storyline; breadth, focus .. unique selling point.
Ready in time for the external review - mid Oct latest
Included into work stream of the program workshop
Use the strategy workshop to take forward.
Develop and document a strong evidence base for the scaling approach; partnerships; numbers; impact pathways
Have something around the 5+2 SI indicators ready
Perhaps need to have 3 projects - linked - to avoid usaid financial ceilings
Constitute small design group - petert, irmgard, chief scientists, carlo, bernard
- impact pathways piece
- systems piece
- numbers piece
[dates: 1-4 september in Wageningen)
Consider ways other initiatives can co-support AR; or we co-support them (eg BMGF-ICRISAT sep 2015 drylands WA convening - Bernard following up)
Need to consider 2 other issues in the phase 2 proposal: partnerships; climate-smart ag
Included into work stream of the program workshop
Use the strategy workshop to take forward.
Drylands convening - Bernard follow up
- take stock how this happens in different countries - chief scientists
Included into work stream of the program workshop
? SAG membership - need replacements for Maggie Gill (livestock) as chair and Dave Harris (farming systems) or economist. PT to lead.
Convene special PCT virtual session on SAG members by mid July; nominate new names by end June.
PCT has to decide the new members. Peter T and Carlo to coordinate.
early august PCT to decide on all this. One more email attempt, then the meeting.
3rd meeting virtual in June
4th meeting in Ethiopia in Nov
Invited to the Oct workshop
2 postdocs getting involved - thru MSU and Columbia U; first results in July 2016. partners meetings, validation, visits all planned, also with AR sites. July 2015 start. Vara to send concept notes to Jerry to circulate.
Post-San Jose steering committee led by SI lab (Vara) the main vehicle to take this agenda forward. Also need more comms around the agenda and all the various activities to wider groups (eg the san jose group). Evolving into a SI CoP.
Included into work stream of the program workshop
Carlo, IHZ and PT to continue active involvement in the steering committee.
ESA in March 2016
Final report April 2016
Interim report Nov 2015
Make clear it is 3+1 projects
Background materials to be prepared on wiki.
Wageningen meeting planned - 31 Aug and 1 Sep
Included into work stream of the program workshop
Work on Farm typologies - Carlo to lead follow up
To be held 6-8 October in Mali
co-locate with learning/M&E events
See points below
Preparing the October workshop
Invitations sent
Local host
Agenda
Phase 1 action list